Portion |
AIR CONDITIONING
(240 minutes)
|
ASPHALT PAVING
(180 minutes)
|
BOILER INSTALLATION
(180 minutes)
|
BRIDGES
(180 minutes)
|
BUSINESS MGMT AND LAW
(125 minutes)
|
CONCRETE
(180 minutes)
|
CONCRETE PAVING
(180 minutes)
|
ELECTRICAL CONTRACTOR
(300 minutes)
|
GENERAL ROOFING
(180 minutes)
|
GLASS AND GLAZING
(150 minutes)
|
GRADING
(120 minutes)
|
HEATING
(180 minutes)
|
LIGHTNING PROTECTION SYST
(180 minutes)
|
LIMITED BUILDING CONTRACTOR
(300 minutes)
|
MARINE
(180 minutes)
|
NASCLA Accredited Trade Examination for Electrical Contractors
(270 minutes)
|
National Commercial Building Contractor Examination (NASCLA)
(330 minutes)
|
PACKAGE EQUIPMENT
(240 minutes)
|
PIPELINES
(180 minutes)
|
PLUMBING CONTRACTOR
(240 minutes)
|
PRE-ENGINEERED METAL BUILDING
(180 minutes)
|
PRESSURE AND PROCESS PIPING (200409)
(120 minutes)
|
PUBLIC UTILITIES (ELECTRIC)
(180 minutes)
|
REFRIGERATION
(180 minutes)
|
SPECIALTY ROOFING
(180 minutes)
|
STRUCTURAL FRAMING
(120 minutes)
|
SWIMMING POOL
(180 minutes)
|
WATER AND SEWER LINES
(180 minutes)
|
WATER AND SEWER PLANTS
(180 minutes)
|
WOOD FRAME STRUCTURES
(180 minutes)
|